Difference between revisions of "CSIT/csit1801 plan"

From fd.io
Jump to: navigation, search
 
(10 intermediate revisions by the same user not shown)
Line 24: Line 24:
 
|-
 
|-
 
| SRv6 performance
 
| SRv6 performance
| tbc
+
| done
 
| 1801-Test
 
| 1801-Test
| SRv6 performance - KWs list is completed and matching test cases documented listed in HLD and task list now in Jira. No code done yet.
+
| SRv6 performance - KWs list is completed and matching test cases documented listed in HLD and task list now in Jira. Initial tests coded. Dry runs wip.
 
|-
 
|-
| clocks per node into PAL
+
| k8s container extensions
| tbc
+
| done
| 1801-PAL
+
| 1801-Test
| Requires VPP API for "show run".
+
| Adding more Pod and Memif topologies: "parallel", "chain", "horizontal".
 
|-
 
|-
| CSIT Data analytics and presentation enhancements
+
| vpp tcp/ip stack
| tbc
+
| done
 +
| 1801-Test
 +
| Initial experimental tests with vpp tcp/ip stack: TG - wrk, TRex.
 +
|-
 +
| Netgate CPE
 +
| next rls
 +
| 1801-Test
 +
| Specific tests to be defined. Delayed due to testbed wiring dependencies.
 +
|-
 +
| SW crypto-dev tests
 +
| done
 +
| 1801-Test
 +
| Complete vpp crypto-dev test coverage.
 +
|-
 +
| cycles per VPP node into CSIT-PAL
 +
| next rls
 +
| 1804-PAL
 +
| Dependency on VPP API for "show run". Status tbc.
 +
|-
 +
| CSIT-PAL multi-core scale-up analysis
 +
| done
 
| 1801-PAL
 
| 1801-PAL
| Code is complete. Code merged in. Now in testing based on stable1801 rc2 test data, in progress.
+
| Multi-core tests in place. Ingestion into CSIT-PAL and report generation needs to be done.
 
|-
 
|-
 
| Centos7 VIRL tests
 
| Centos7 VIRL tests
| WIP
+
| wip
 
| VIRL-GetWellPlan
 
| VIRL-GetWellPlan
 
| [https://jira.fd.io/browse/CSIT-602 CSIT-602] Complete productization of Centos7 VPP tests for all VPP functional tests in FD.io CSIT VIRL infra.
 
| [https://jira.fd.io/browse/CSIT-602 CSIT-602] Complete productization of Centos7 VPP tests for all VPP functional tests in FD.io CSIT VIRL infra.
Line 59: Line 79:
 
|-
 
|-
 
| Code complete
 
| Code complete
| 2018-01-xx
+
| 2018-01-10
 
| Test cases code frozen. Only bug fixes and low-risk changes accepted.
 
| Test cases code frozen. Only bug fixes and low-risk changes accepted.
 
|-
 
|-
 
| Branch pull
 
| Branch pull
| 2018-01-xx
+
| 2018-01-10
 
| Pull CSIT rls1801 throttle branch.
 
| Pull CSIT rls1801 throttle branch.
 
|-
 
|-
 
| CSIT Release
 
| CSIT Release
| 2018-01-xx
+
| 2018-01-17
 
| CSIT rls1801 test code complete. VPP1801 rls testing.
 
| CSIT rls1801 test code complete. VPP1801 rls testing.
 
|-
 
|-
 
| CSIT Report
 
| CSIT Report
| 2018-01-xx
+
| 2018-02-14
| CSIT rls1801 report published
+
| CSIT rls1801 report to be published, after completing execution of all performance tests. Date moved due to identified performance regression, and VPP18.01.1.
 
|}
 
|}
  
 
== Expected Dependencies on Other Projects ==
 
== Expected Dependencies on Other Projects ==

Latest revision as of 16:49, 7 February 2018


Please be aware that this page is work-in-progress and more info is being added continuously.

Introduction

All CSIT release deliverables should be tracked in FDio CSIT Jira using one of the following Jira Epic categories:

  1. 1801-Report CSIT-737.
  2. 1801-Test CSIT-735.
  3. VIRL-GetWellPlan CSIT-581.
  4. 1801-Optimizations CSIT-738.
  5. 1801-Honeycomb CSIT-734.
  6. 1801-Operations CSIT-739.

Release Deliverables

Name Status Category Description
SRv6 performance done 1801-Test SRv6 performance - KWs list is completed and matching test cases documented listed in HLD and task list now in Jira. Initial tests coded. Dry runs wip.
k8s container extensions done 1801-Test Adding more Pod and Memif topologies: "parallel", "chain", "horizontal".
vpp tcp/ip stack done 1801-Test Initial experimental tests with vpp tcp/ip stack: TG - wrk, TRex.
Netgate CPE next rls 1801-Test Specific tests to be defined. Delayed due to testbed wiring dependencies.
SW crypto-dev tests done 1801-Test Complete vpp crypto-dev test coverage.
cycles per VPP node into CSIT-PAL next rls 1804-PAL Dependency on VPP API for "show run". Status tbc.
CSIT-PAL multi-core scale-up analysis done 1801-PAL Multi-core tests in place. Ingestion into CSIT-PAL and report generation needs to be done.
Centos7 VIRL tests wip VIRL-GetWellPlan CSIT-602 Complete productization of Centos7 VPP tests for all VPP functional tests in FD.io CSIT VIRL infra.
CSIT Framework Optimization tbc 1801-Optimizations CSIT-738 CSIT code optimizations. Description in Design Optimizations wiki.

Release Milestones

rls1801 Milestone Date Deliverables
Code complete 2018-01-10 Test cases code frozen. Only bug fixes and low-risk changes accepted.
Branch pull 2018-01-10 Pull CSIT rls1801 throttle branch.
CSIT Release 2018-01-17 CSIT rls1801 test code complete. VPP1801 rls testing.
CSIT Report 2018-02-14 CSIT rls1801 report to be published, after completing execution of all performance tests. Date moved due to identified performance regression, and VPP18.01.1.

Expected Dependencies on Other Projects