Difference between revisions of "CSIT/csit2009 plan"

From fd.io
Jump to: navigation, search
(Created page with "Category:Release Plan == Introduction == This page tracks release information for FD.io CSIT-2009. It is updated regularly by hand. Real-time information is available in...")
 
(Release Deliverables)
 
(One intermediate revision by the same user not shown)
Line 45: Line 45:
 
|-
 
|-
 
| VPP-DEV API coverages
 
| VPP-DEV API coverages
| TODO
+
| DONE
 
| Device
 
| Device
 
| Add NAT-ED and NAT-EI vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch.
 
| Add NAT-ED and NAT-EI vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch.
 
|-
 
|-
 
| NAT-ED perf tests
 
| NAT-ED perf tests
| WIP
+
| DONE
 
| Performance  
 
| Performance  
 
| Add performance tests for NAT endpoint-dependent mode.
 
| Add performance tests for NAT endpoint-dependent mode.
 
|-
 
|-
 
| NAT-EI perf tests
 
| NAT-EI perf tests
| WIP
+
| DONE
 
| Performance  
 
| Performance  
 
| Add performance tests for NAT endpoint-independent mode.
 
| Add performance tests for NAT endpoint-independent mode.

Latest revision as of 10:09, 4 November 2020


Introduction

This page tracks release information for FD.io CSIT-2009. It is updated regularly by hand. Real-time information is available in FD.io CSIT code repository and auto-generated docs.

Release Milestones

Milestone Date Deliverables
F0 2020-09-02 Test case keywords code complete. Only low-risk changes accepted.
RC1 2020-09-09 (F0+7) Code complete. Pull first release branch. Only bug fixes accepted in release branch. Date aligned with VPP RC1. Start dry-runs to identify CSIT gaps on less frequently run tests.
RC2 2020-09-16 (RC1+7) Dry-run testing begins of VPP RC2, performance and functional. Date aligned with VPP RC2.
CSIT Release 2020-09-30 (RC2+14) CSIT release complete. VPP release testing starts. Date aligned with VPP Formal Release.
Report Publish 2020-10-14 (Rls+14) CSIT report published for VPP release.

Release Deliverables

Name Status Jira Category Description
VPP-DEV API coverages DONE Device Add NAT-ED and NAT-EI vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch.
NAT-ED perf tests DONE Performance Add performance tests for NAT endpoint-dependent mode.
NAT-EI perf tests DONE Performance Add performance tests for NAT endpoint-independent mode.

Jira Task Tracking

All CSIT release deliverables should be tracked in FDio CSIT Jira using one of the following Jira Epic categories:

Framework
CI process
Performance
Device
Methodology
Telemetry
Tools
Presentation
Honeycomb
Aarch64

Multi-Release Work Areas

Work Area Description

External Dependencies

  1. No known external dependencies.