Difference between revisions of "Projects/vpp/Release Plans/Release Plan 18.07"

From fd.io
Jump to: navigation, search
(Release Milestones)
Line 43: Line 43:
  
 
|-  
 
|-  
| rowspan="2" | Kube-proxy || Rework into LB Plugin || Deferred to 18.07
+
| rowspan="2" | Kube-proxy || Rework into LB Plugin || Done
 
|-  
 
|-  
                     || NAT66 support || In Progress
+
                     || NAT66 support || Done
  
 
|-
 
|-
| rowspan="1" | LB || ||
+
| rowspan="1" | LB || Support stats for each vip and as || In progress
 
|}
 
|}
  

Revision as of 10:52, 7 June 2018

Introduction

This page tracks release information for 18.04.

Release Deliverables

Name Description Status
INFRA DPDK 18.05 integration
VNET
API "Show Run" stats api refactoring (VPP-55) In Progress
HOSTSTACK
Kube-proxy Rework into LB Plugin Done
NAT66 support Done
LB Support stats for each vip and as In progress

Release Milestones

Milestone Date Deliverables
F0 2018-07-09 APIs frozen. Only low-risk changes accepted on main branch.
RC1 2018-07-16 (F0+7) Code complete, pull first release throttle branch, only bug fixes accepted on throttle train. After pull: main branch reopens for new feature / risky commits. First artifacts posted.
RC2 2018-07-23 (RC1+7) Second artifacts posted.
Formal Release 2018-07-30 (RC2+7) 18.07 release artifacts available

NOTE: Dates chosen based on:

  • mid-month release
  • milestone + days
  • day after VPP community meeting, for discussion, go/no-go

Once we've pulled the 18.07 release throttle

We need to be disciplined with respect to bugfix commits. Here are a few common-sense suggestions:

  • All bug fixes must be double-committed to the release throttle as well as to the master branch
    • Commit first to the release throttle, then "git cherry-pick" into master
    • Manual merges may be required, depending on the degree of divergence between throttle and master
  • All bug fixes need to have a Jira ticket
    • Please put Jira IDs into the commit messages.
    • Please use the same Jira ID for commits into the stable branch and master.


Features to be added in 18.07

NEED JIRA/CONFLUENCE IMPORT HERE


Expected Dependencies on Other Projects