Projects/vpp/Release Plans/Release Plan 20.05

From fd.io
Revision as of 19:35, 20 May 2020 by Ayourtch (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Introduction

This page tracks release information for 20.05

Release Deliverables

Please consult the 20.05 Release Notes at https://gerrit.fd.io/r/c/vpp/+/27128


Release Milestones

the milestones' time will be at 18:00 UTC on the day of the milestone.


Milestone Date Deliverables
F0 2020-05-06 APIs frozen. Only low-risk changes accepted on main branch.
RC1 2020-05-13 (F0+7) Code complete, pull first release throttle branch, only bug fixes accepted on throttle train. After pull: main branch reopens for new feature / risky commits. First artifacts posted.
RC2 2020-05-20 (RC1+7) Second artifacts posted.
Formal Release 2020-05-27 (RC2+7) 20.05 release artifacts available

NOTE: Dates chosen based on:

  • end-month release
  • milestone + days
  • release date after VPP community meeting, for discussion, go/no-go

Once we've pulled the 20.05 release throttle

We need to be disciplined with respect to bugfix commits. Here are a few common-sense suggestions:

  • All bug fixes must be double-committed to the release throttle, and 19.08 LTS, and the master branch
    • Commit first to the master branch, then "git cherry-pick" into release throttle
    • Manual merges may be required, depending on the degree of divergence between throttle and master
  • All bug fixes need to have a Jira ticket
    • Please put Jira IDs into the commit messages.
    • Please use the same Jira ID for commits into the stable branch and master.
NEED JIRA/CONFLUENCE IMPORT HERE

Expected Dependencies on Other Projects