Difference between revisions of "Projects/vpp/Release Plans/Release Plan 20.01"
From fd.io
(Created page with "== Introduction == This page tracks release information for 20.01 == Release Deliverables == {|class="wikitable" ! Name ! Description ! Status |- | rowspan="1" | feature...") |
(→Release Deliverables) |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 5: | Line 5: | ||
== Release Deliverables == | == Release Deliverables == | ||
+ | |||
+ | Please consult the 20.01 Release Notes at: https://docs.fd.io/vpp/20.01/df/d78/release_notes_2001.html | ||
+ | |||
+ | <!-- | ||
{|class="wikitable" | {|class="wikitable" | ||
! Name | ! Name | ||
Line 12: | Line 16: | ||
|- | |- | ||
− | | rowspan="1" | | + | | rowspan="1" | Buffer Metadata Tracker || Report per-node changes to buffer metadata || Merged |
+ | |- | ||
+ | | rowspan="1" | Address Sanitizer || Initial support for Address Sanitizer. Only heap for now. || Merged | ||
+ | |- | ||
+ | | rowspan="1" | mlx5 direct verb rdma driver || Optimized datapath for ConnectX4/5/6 adapters || Work in progress | ||
|} | |} | ||
+ | |||
+ | --> | ||
== Release Milestones == | == Release Milestones == | ||
− | <span style="font-size:120%">The schedule below is DRAFT </span> | + | <!-- <span style="font-size:120%">The schedule below is DRAFT </span> --> |
<!-- As agreed during the Jan 8 VPP project meeting, --> | <!-- As agreed during the Jan 8 VPP project meeting, --> | ||
Line 34: | Line 44: | ||
|- | |- | ||
| RC1 | | RC1 | ||
− | | 2020-01-15 | + | | 2020-01-15 (F0+7) |
| Code complete, pull first release throttle branch, only bug fixes accepted on throttle train. After pull: main branch reopens for new feature / risky commits. First artifacts posted. | | Code complete, pull first release throttle branch, only bug fixes accepted on throttle train. After pull: main branch reopens for new feature / risky commits. First artifacts posted. | ||
|- | |- | ||
| RC2 | | RC2 | ||
− | | 2020-01-22 | + | | 2020-01-22 (RC1+7) |
| Second artifacts posted. | | Second artifacts posted. | ||
|- | |- | ||
| Formal Release | | Formal Release | ||
− | | 2020-01-29 | + | | 2020-01-29 (RC2+7) |
| 20.01 release artifacts available | | 20.01 release artifacts available | ||
|} | |} |
Latest revision as of 10:47, 4 February 2020
Contents
Introduction
This page tracks release information for 20.01
Release Deliverables
Please consult the 20.01 Release Notes at: https://docs.fd.io/vpp/20.01/df/d78/release_notes_2001.html
Release Milestones
the milestones' time will be at 18:00 UTC on the day of the milestone.
Milestone | Date | Deliverables |
---|---|---|
F0 | 2020-01-08 | APIs frozen. Only low-risk changes accepted on main branch. |
RC1 | 2020-01-15 (F0+7) | Code complete, pull first release throttle branch, only bug fixes accepted on throttle train. After pull: main branch reopens for new feature / risky commits. First artifacts posted. |
RC2 | 2020-01-22 (RC1+7) | Second artifacts posted. |
Formal Release | 2020-01-29 (RC2+7) | 20.01 release artifacts available |
NOTE: Dates chosen based on:
- end-month release
- milestone + days
- release date after VPP community meeting, for discussion, go/no-go
Once we've pulled the 20.01 release throttle
We need to be disciplined with respect to bugfix commits. Here are a few common-sense suggestions:
- All bug fixes must be double-committed to the release throttle as well as to the master branch
- Commit first to the release throttle, then "git cherry-pick" into master
- Manual merges may be required, depending on the degree of divergence between throttle and master
- All bug fixes need to have a Jira ticket
- Please put Jira IDs into the commit messages.
- Please use the same Jira ID for commits into the stable branch and master.
NEED JIRA/CONFLUENCE IMPORT HERE