Difference between revisions of "CSIT/csit2101 plan"
From fd.io
< CSIT
Juraj.linkes (Talk | contribs) (→Release Deliverables) |
(→Release Deliverables) |
||
Line 45: | Line 45: | ||
|- | |- | ||
| VPP-DEV API coverages | | VPP-DEV API coverages | ||
− | | | + | | DONE |
| Device | | Device | ||
| Add GENEVE tunnel L3 mode vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch. | | Add GENEVE tunnel L3 mode vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch. |
Revision as of 14:57, 9 December 2020
Contents
Introduction
This page tracks release information for FD.io CSIT-2101. It is updated regularly by hand. Real-time information is available in FD.io CSIT code repository and auto-generated docs.
Release Milestones
Milestone | Date | Deliverables |
---|---|---|
F0 | 2020-12-09 | Test case keywords code complete. Only low-risk changes accepted. |
RC1 | 2020-12-16 (F0+7) | Code complete. Pull first release branch. Only bug fixes accepted in release branch. Date aligned with VPP RC1. Start dry-runs to identify CSIT gaps on less frequently run tests. |
RC2 | 2021-01-13 (RC1+28) | Dry-run testing begins of VPP RC2, performance and functional. Date aligned with VPP RC2. |
CSIT Release | 2021-01-20 (RC2+7) | CSIT release complete. VPP release testing starts. Date aligned with VPP Formal Release. |
Report Publish | 2021-01-27 (RC2+14) | CSIT report published for VPP release. |
Release Deliverables
Name | Status | Jira Category | Description |
---|---|---|---|
VPP-DEV API coverages | DONE | Device | Add GENEVE tunnel L3 mode vpp_device tests for better VPP API coverage, as those are executed per vpp patch and per csit patch. |
GENEVE tunnel perf tests | WIP | Performance | Add performance tests for GENEVE tunnel L3 mode. |
ThunderX2 1n-tx2 testbeds | VERIFY | Device | Add Arm ThunderX2 VPP Device testbeds. |
ThunderX2 2n-tx2 testbed | WIP | Performance | Add 2-node Arm ThunderX2 performance testbed. |
Faster Arm perf job execution times | WIP | Performance | The Arm perf jobs are very slow. Change the Jenkins executor from ThunderX to something faster. |
Jira Task Tracking
All CSIT release deliverables should be tracked in FDio CSIT Jira using one of the following Jira Epic categories:
Framework CI process Performance Device Methodology Telemetry Tools Presentation Honeycomb Aarch64
Multi-Release Work Areas
Work Area | Description |
---|
External Dependencies
- No known external dependencies.