CSIT/Meeting

From fd.io
< CSIT
Revision as of 11:10, 3 August 2022 by Vluc (Talk | contribs)

Jump to: navigation, search

Meeting Details

Weekly on Wednesday 15:00 Greenwich, London time. FD.io Zoom Meeting room (passcode <remove spaces> '4 1 2 3 2 4')
If no DST in Europe and US: 07:00 PST, 10:00 EST, 15:00 UTC, 15:00 UK/GMT, 16:00 CET, 17:00 Israel Std Time, 20:30 India Std Time, 23:00 China Std Time.
If DST in Europe: 07:00 PDT, 10:00 EDT, 14:00 UTC, 15:00 UK/BST, 16:00 CEST, 17:00 Israel Summer Time, 19:30 India Std Time, 22:00 China Std Time.
If no DST in Europe and DST in US: 08:00 PDT, 11:00 EDT, 15:00 UTC, 15:00 UK/GMT, 16:00 CET, 17:00 Israel Std Time, 20:30 India Std Time, 23:00 China Std Time.

Topic: FD.io CSIT Project Meeting

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/my/fastdata?pwd=Z3Z0UnJyUmRIMlU3eTJLcGF6VEptQT09

Or iPhone one-tap (US Toll):  +14086380968,,5301185804# or +16465588656,,5301185804#

Or Telephone:
    Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll)
    +1 855 880 1246 (US Toll Free)
    +1 877 369 0926 (US Toll Free)
    Meeting ID: 530 118 5804
    International numbers available: https://zoom.us/zoomconference?m=ppBOQMQTVxGYmbxNsVemC6KNo8eX2ptF

Issues connecting to the meeting? Contact: Maciek Konstantynowicz <mkonstan@cisco.com>.

Agenda

The next CSIT meeting is scheduled for Wednesday 27-Jul 15:00-16:00 Greenwich, London time / 07:00-08:00 PST. Proposed topics:

  1. Agenda bashing.
  2. Inputs from projects
  3. New or being refactored tests
    • E810 flow "offload" tests
    • Scale tests revisited
      • Currently amount of executed scale tests is reduced for ip4, ip6, nat, ipsec.
      • This is due to poor performance of PAPI and excessive time taken for configuring VPP.
      • Work to restart to review feasible option to have this fixed, Vratko, Ole, Andrew, Dave.
  4. VPP and CSIT hot items
  5. Releases CSIT-2206
    • Testing status
    • Report status
    • 100 GbE tests with newly fitted and calibrated MLX ConnectX5-ex and TRex v2.96
      • with 16 pmd threads max aggregate 2x 100 GbE STL performance: 188Mpps TX rate and 133Mpps RX rate
    • telemetry - vpp perfmon and linux bpf telemetry
    • CSIT UTI
    • New platforms and testbeds: new ICX testbeds, SnowRidge (3n-snr)
    • CVL 100 GbE flow-based tests
  6. Physical Infrastructure
    • Performance testing: Xeon Skx/Ckx/Icx, Arm, Atom.
    • Functional driver testing: Xeon Skx, Arm Tx2.
    • Updated LFN FD.io infra support documentation.
    • Lab new hardware builds:
      • Perf - 17 supermicro icx servers
        • 5 servers in production: 2n-icx, 3n-icx testbeds.
        • 2 servers used for TG/TRex machines for new testbed builds (2n-alt).
        • 10 servers being used for new testbeds build
    • AMD requests to increase AMD participation level in CSIT benchmarking, Keesang et al.
    • 2x Atom SnowRidge servers (4RU) onboarding status.
  7. Virtual Infrastructure, CI/CD
    • LFN FD.io CI/CD systems.
    • Jenkins jobs: csit-vpp, vpp-csit, trending.
    • vpp-csit jobs: vpp-csit-verify-device-{..}-tx2 (not voting), vpp-csit-verify-device-{..}-skx (voting)
  8. Environment, Framework
  9. Trending
  10. Analytics, Presentation.
  11. Fd.io Events.
  12. Housekeeping.

Meeting Minutes