CSIT/Meeting

From fd.io
< CSIT
Revision as of 15:48, 17 August 2023 by Mackonstan (Talk | contribs)

Jump to: navigation, search

Meeting Details

Weekly on Wednesday 15:00 Greenwich, London time. FD.io Zoom Meeting room (passcode <remove spaces> '4 1 2 3 2 4')
If no DST in Europe and US: 07:00 PST, 10:00 EST, 15:00 UTC, 15:00 UK/GMT, 16:00 CET, 17:00 Israel Std Time, 20:30 India Std Time, 23:00 China Std Time.
If DST in Europe: 07:00 PDT, 10:00 EDT, 14:00 UTC, 15:00 UK/BST, 16:00 CEST, 17:00 Israel Summer Time, 19:30 India Std Time, 22:00 China Std Time.
If no DST in Europe and DST in US: 08:00 PDT, 11:00 EDT, 15:00 UTC, 15:00 UK/GMT, 16:00 CET, 17:00 Israel Std Time, 20:30 India Std Time, 23:00 China Std Time.

Topic: FD.io CSIT Project Meeting

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/my/fastdata?pwd=Z3Z0UnJyUmRIMlU3eTJLcGF6VEptQT09

Or iPhone one-tap (US Toll):  +14086380968,,5301185804# or +16465588656,,5301185804#

Or Telephone:
    Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll)
    +1 855 880 1246 (US Toll Free)
    +1 877 369 0926 (US Toll Free)
    Meeting ID: 530 118 5804
    International numbers available: https://zoom.us/zoomconference?m=ppBOQMQTVxGYmbxNsVemC6KNo8eX2ptF

Issues connecting to the meeting? Contact: Maciek Konstantynowicz <mkonstan@cisco.com>.

Agenda

The next CSIT meeting is scheduled for Wednesday 23-August 15:00-16:00 Greenwich, London time / 07:00-08:00 PDT. Proposed topics:

  1. Notes: `#chair dwallacelf jlinkes vrpolak mackonstan tifrank`
  2. Agenda bashing.
  3. Inputs from projects
    • FD.io: VPP, TSC, other.
  4. New or refactored tests
    • E810 flow "offload" tests
      • device: updating tests with new dpdk offload flags.
  5. VPP and CSIT (not so hot) items
    • HW accelerator - SPR QAT2.0
    • HW accelerator - SNR QAT2.0
    • HW accelerator - SPR DSA
    • HW accelerator - E810 GTPU offload
    • AMD performance results
  6. Previous Release CSIT-2306
  7. Next Release CSIT-2310
  8. Physical Infrastructure
    • Performance testing: Intel Xeon CLX/ICX/SPR, Arm TX2/TSH/ALT, Intel Atom, AMD Zen2.
    • Functional driver testing: Intel Xeon SKX, Arm TX2.
    • Updated LFN FD.io infra support documentation.
    • Lab extension - waiting for tech info and quotations
      • 2023 part-1: add 4 x Xeon SPR 4RU servers for 2 x 1n-spr vpp_device testbeds and 2 x TG-TRex servers
      • 2023 part-2: add 2 x 3n-icxd performance testbeds
        • Each 3n-icxd with: 2 x SuperMicro SYS-110D-20C-FRAN8TP 1RU servers and 0.5 of TG-TRex server - To Be Confirmed
  9. Virtual Infrastructure, CI/CD
    • LFN FD.io CI/CD systems.
    • Jenkins jobs: csit-vpp, vpp-csit.
    • vpp-csit jobs: vpp-csit-verify-device-{..}-tx2 (voting), vpp-csit-verify-device-{..}-skx (voting)
      • reports of intermittent failures not related to vpp patch code changes
  10. Environment, Framework
    • VPP API tracking.
      • In-progress messages.
      • CLI without API.
  11. Trending and Test Failures
  12. Analytics, Presentation.
  13. Fd.io Events
  14. Housekeeping.
    • Pylint version, pylint configuration, black, line length...

Meeting Minutes