Difference between revisions of "VPP/Meeting"

From fd.io
< VPP
Jump to: navigation, search
m (Meeting Details)
m (Agenda)
Line 24: Line 24:
 
** Versioning, naming on (master, stable/16.06)
 
** Versioning, naming on (master, stable/16.06)
 
** packaging updates (CJ Collier, Tom Herbert, Ed Warnicke)
 
** packaging updates (CJ Collier, Tom Herbert, Ed Warnicke)
** Bug fix mechanics: commit into stable/16.06, git cherry-pick into master
 
** Committers
 
*** Please watch for missing double-commits
 
*** Please no binary API (.../vpp/api/vpe.api) changes w/ out discussion on vpp-dev@lists.fd.io
 
 
** Test, test, test...  
 
** Test, test, test...  
 
* fd.io infrastructure discussion
 
* fd.io infrastructure discussion
Line 34: Line 30:
 
** Jira <--> Gerrit integration: pull-down default should be "all reviews," not "open-reviews."
 
** Jira <--> Gerrit integration: pull-down default should be "all reviews," not "open-reviews."
 
* JIRA walkthrough
 
* JIRA walkthrough
** Open Bugs  
+
** 34 open Bugs
 +
** Identify 16.06 release stoppers 
 
* Code Base activity report - 30 merged (up from 23 last week)
 
* Code Base activity report - 30 merged (up from 23 last week)
 
** NSH move to plugin/project
 
** NSH move to plugin/project

Revision as of 12:25, 24 May 2016

Meeting Details

Weekly on Tuesday from 8-9am PST. Click here to register for the meeting. Note: registration now required, to mitigate Toll Fraud

Agenda

The next VPP meeting is scheduled for May 17, 2016 with the following agenda:

  • Agenda Additions
  • Reports from other fd.io projects
    • CSIT
    • Honeycomb
    • NSH / SFC
    • ONE-LISP
    • Sandbox
  • VPP release 16.06 planning
    • see [16.06 release plan]
    • Release branch pulled (stable/16.06)
    • Versioning, naming on (master, stable/16.06)
    • packaging updates (CJ Collier, Tom Herbert, Ed Warnicke)
    • Test, test, test...
  • fd.io infrastructure discussion
    • Verify / csit breaks, slaves offline, etc. etc.
    • Jira resolution field
    • Jira <--> Gerrit integration: pull-down default should be "all reviews," not "open-reviews."
  • JIRA walkthrough
    • 34 open Bugs
    • Identify 16.06 release stoppers
  • Code Base activity report - 30 merged (up from 23 last week)
    • NSH move to plugin/project
    • Numerous bugfixes
  • Consumability
    • Other issues getting in the way?

Meeting Minutes

2016-05-17

2016-05-10

2016-05-03

2016-04-26

2016-04-19

Note meeting ended on 2016-04-26 on IRC

2016-04-12

2016-04-05

  • Meeting cancelled due to Training/Hackfest

2016-03-22

2016-03-15

2016-03-08

2016-03-01

2016-02-23

2016-02-16