Difference between revisions of "VPP/Meeting"

From fd.io
< VPP
Jump to: navigation, search
(Meeting Details)
(Meeting Minutes)
Line 39: Line 39:
  
 
== Meeting Minutes ==
 
== Meeting Minutes ==
 +
 +
=== 2016-05-24 ===
 +
 +
* Meeting ended Tue May 24 16:02:43 2016 UTC.  Information about MeetBot at http://wiki.debian.org/MeetBot . (v 0.1.4)
 +
* Minutes:        http://ircbot.wl.linuxfoundation.org/meetings/fdio-vpp/2016/fdio-vpp.2016-05-24-15.00.html
 +
* Minutes (text): http://ircbot.wl.linuxfoundation.org/meetings/fdio-vpp/2016/fdio-vpp.2016-05-24-15.00.txt
 +
* Log:            http://ircbot.wl.linuxfoundation.org/meetings/fdio-vpp/2016/fdio-vpp.2016-05-24-15.00.log.html
  
 
=== 2016-05-17 ===
 
=== 2016-05-17 ===

Revision as of 16:03, 24 May 2016

Meeting Details

Weekly on Tuesday from 8-9am PST. Click here to register for the meeting. Note: registration now required, to mitigate Toll Fraud Issues connecting to meeting? Contact Quyen Dang qudang@cisco.com

Agenda

The next VPP meeting is scheduled for May 17, 2016 with the following agenda:

  • Agenda Additions
  • Reports from other fd.io projects
    • CSIT
    • Honeycomb
    • NSH / SFC
    • ONE-LISP
    • Sandbox
  • VPP release 16.06 planning
    • see [16.06 release plan]
    • Release branch pulled (stable/16.06)
    • packaging updates (CJ Collier, Tom Herbert, Ed Warnicke)
      • Debian packages built on Ubuntu 16.04 LTS will not install on Ubuntu 14.04 LTS
    • Test, test, test...
  • fd.io infrastructure discussion
    • Verify / csit breaks, slaves offline, etc. etc.
    • Jira resolution field
    • Jira <--> Gerrit integration: pull-down default should be "all reviews," not "open-reviews."
  • JIRA walkthrough
    • 34 open Bugs
    • Identify 16.06 release stoppers
  • Code Base activity report - 25 merged (down from 30 last week)
    • Mostly bug fixes; only 2 in stable/1606.
    • VPP-77, Gerrit 1160 missing double-commits back to master?
  • Consumability
    • Other issues getting in the way?

Meeting Minutes

2016-05-24

2016-05-17

2016-05-10

2016-05-03

2016-04-26

2016-04-19

Note meeting ended on 2016-04-26 on IRC

2016-04-12

2016-04-05

  • Meeting cancelled due to Training/Hackfest

2016-03-22

2016-03-15

2016-03-08

2016-03-01

2016-02-23

2016-02-16