Difference between revisions of "VPP/Meeting"
From fd.io
< VPP
m (→Agenda) |
m (→Agenda) |
||
Line 38: | Line 38: | ||
** Release: 2018-07-30 (done) | ** Release: 2018-07-30 (done) | ||
** Point release plan? | ** Point release plan? | ||
+ | * VPP release 18.10 (Marco V) | ||
+ | * cmake build system transition | ||
+ | ** massive build performance improvement noted | ||
* Infrastructure status | * Infrastructure status | ||
** Build system - no major issues noted | ** Build system - no major issues noted | ||
− | ** | + | ** [https://packagecloud.io/fdio packagecloud.io] transition status? |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
* Fd.io Events - (fd.io marketing committee representative) | * Fd.io Events - (fd.io marketing committee representative) | ||
** [https://www.dpdk.org/event/dpdk-userspace-dublin-2018/ DPDK User Space, September 5-6th, Dublin] | ** [https://www.dpdk.org/event/dpdk-userspace-dublin-2018/ DPDK User Space, September 5-6th, Dublin] | ||
Line 54: | Line 51: | ||
** [https://events.linuxfoundation.org/events/kubecon-cloudnativecon-north-america-2018/ Kubecon Seattle Dec 11-13] | ** [https://events.linuxfoundation.org/events/kubecon-cloudnativecon-north-america-2018/ Kubecon Seattle Dec 11-13] | ||
** [https://events.linuxfoundation.org/events/kubecon-cloudnativecon-north-america-2018/co-located-events/envoycon/ EnvoyCon] - Dec 10 Seattle - Colocated with Kubecon | ** [https://events.linuxfoundation.org/events/kubecon-cloudnativecon-north-america-2018/co-located-events/envoycon/ EnvoyCon] - Dec 10 Seattle - Colocated with Kubecon | ||
− | *** [https://docs.google.com/forms/d/1aXLVAm1YS66srkoYCMgiu0_LrxK0ICtkqEpaacsqrWQ/viewform?edit_requested=true CFP | + | *** [https://docs.google.com/forms/d/1aXLVAm1YS66srkoYCMgiu0_LrxK0ICtkqEpaacsqrWQ/viewform?edit_requested=true CFP Closed] |
− | + | ||
* Issues? | * Issues? | ||
* Metrics | * Metrics | ||
** Code Base activity: 144 merged (record, I think!), up from 79 in the previous two-week period | ** Code Base activity: 144 merged (record, I think!), up from 79 in the previous two-week period | ||
** Infra: 26 rechecks, up from 16 rechecks in the previous two week period | ** Infra: 26 rechecks, up from 16 rechecks in the previous two week period | ||
− | ** [//scan.coverity.com/projects/fd-io-vpp Latest Coverity Run Results] | + | ** [//scan.coverity.com/projects/fd-io-vpp Latest Coverity Run Results] 22 Coverity issues in master/latest |
+ | *** NSH plugin: legitimate dual-loop cut/paste bug | ||
** [http://stackalytics.com/?release=all&project_type=fdio-group&metric=commits&module=vpp Stackalytics code contribution metrics] | ** [http://stackalytics.com/?release=all&project_type=fdio-group&metric=commits&module=vpp Stackalytics code contribution metrics] | ||
Revision as of 13:52, 4 September 2018
Meeting Details
Biweekly on Tuesdays, 8-9am PT. FD.io Zoom Meeting room
Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/5301185804 or https://zoom.us/my/fastdata Or iPhone one-tap (US Toll): +14086380968,,5301185804# or +16465588656,,5301185804# Or Telephone: Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) +1 855 880 1246 (US Toll Free) +1 877 369 0926 (US Toll Free) Meeting ID: 530 118 5804 International numbers available: https://zoom.us/zoomconference?m=ppBOQMQTVxGYmbxNsVemC6KNo8eX2ptF
Issues connecting to meeting? Contact Jong Hahn: jonhahn@cisco.com
- IRC
- #fdio-vpp room on freenode
- Web-based IRC client: https://webchat.freenode.net/
Agenda
The next VPP meeting is scheduled for September 4, 2018:
- Agenda Additions
- Reports from other fd.io projects
- CSIT (Maciek)
- Honeycomb (Marek)
- Host stack (Florin)
- Documentation (Ray, John D)
- ARM64 / aarch64 support (Tina T)
- VPP release 18.07 (Ed W)
- [18.07 Release Plan]
- Release: 2018-07-30 (done)
- Point release plan?
- VPP release 18.10 (Marco V)
- cmake build system transition
- massive build performance improvement noted
- Infrastructure status
- Build system - no major issues noted
- packagecloud.io transition status?
- Fd.io Events - (fd.io marketing committee representative)
- Issues?
- Metrics
- Code Base activity: 144 merged (record, I think!), up from 79 in the previous two-week period
- Infra: 26 rechecks, up from 16 rechecks in the previous two week period
- Latest Coverity Run Results 22 Coverity issues in master/latest
- NSH plugin: legitimate dual-loop cut/paste bug
- Stackalytics code contribution metrics
Meeting Minutes
VPP project meeting minutes now have their own page